Pressure is building, figuratively and literally (see photograph of pressure gauge for the literal). Five zones of radiant tubing installed more-or-less to design with the odd wrong turn here and there. Footings poured earlier in the week. Strap hold-downs for shear walls installed as well.
Friday, June 22, 2007
pressure building...
Pressure is building, figuratively and literally (see photograph of pressure gauge for the literal). Five zones of radiant tubing installed more-or-less to design with the odd wrong turn here and there. Footings poured earlier in the week. Strap hold-downs for shear walls installed as well.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment