Friday, March 14, 2008

kitchen sneak peak...



Photographs showing the half completed kitchen cabinetry. The Paper Stone counter top is scheduled for delivery next week. Also shown are the powder room door - glass to be frosted eventually - and the baby's dresser and assorted goodies.

Saturday, March 8, 2008

ceiling fans...

Trying to find a ceiling fan that is 1) modern, 2) simple, 3) warm (ie, not too modern), and 4) doesn't look like a prop from Gone With the Wind. If we can actually find this animal (seen in photos) locally and get a better look at it, it might do the trick. There are 2 ceiling fans in the vaulted living / dining / kitchen wing. Having the up and down lights (each operates individually) would be a bonus.

Tuesday, February 26, 2008

Two pictures showing the finish plaster coat. Picture one shows a somewhat rustic niche in the spare bedroom. Picture two shows the bookshelf hallway - minus the actual book shelves. BUT, look closely and you will see an illuminated ceiling light at the top of the frame. That's new. There are also some switches and electrical outlets scattered about. Good times.

Sunday, February 17, 2008

IKEA assembly line...

Sunday afternoon marked a break in the schedule - time to begin assembling the kitchen and bathroom cabinetry. There's a LOT of flat packs laying around the living room at the moment. By the time we broke for dinner we had assembled three kitchen base cabinets and this bathroom vanity (seen below). It will hopefully only take a couple weeks of evenings and Sundays to get everything more-or-less put together...